Welcome to Steve Stafford's Blog ~ Revit OpEd = OPinion EDitorial ~ My view of things Revit, both real and imagined.
Friday, January 10, 2014
Schedules can be in a Group
Alex at RFO mentioned in a thread that he has created a Group with schedules on sheets to help manage them when he needed them on more than one sheet. I wouldn't have thought it was even possible and I probably wouldn't have thought to try that even if it occurred to me.
Schedules that are on more than one sheet can end up in different locations so a Groups origin could make it a bit easier to ensure a schedule or schedules are arranged the same way from sheet to sheet.
Something to think about, hat tip to Alex!
Subscribe to:
Post Comments (Atom)
2 comments:
I am honored.
hi is that possible to transfer schedule/ colour schemes from one project to multiple projects (25 different files) at the same time instead of opening a file one by one using the option insert 2d files or copy paste
Post a Comment