With all the hoopla about BIM and IPD one thing I have not heard much about (actually I can't recall anyone discussing this within earshot) is the submittal process. I get the feeling that for most it is still business as usual; catalog cuts, 2D drawings and "can we get an approved or reviewed stamp ASAP?".
Seems to me that it is a natural expectation, or logical next step, that we start requiring 3D submissions from our project's array of contractors. I alluded to the importance of doing so in an earlier post when I mentioned the serious coordination issues associated with theater/stage construction. We were just using AutoCAD and not even modelling solid parts back then. We looked at Pro/E and were put off by the specialized hardware and the shockingly high seat price (shocked us anyway).
I remember clearly asking how I would use Pro/E to create our submittal drawings, which depict how our equipment would work in the building. I was amused when the reply was, "I supposed you'd model the parts of the building you are touching." This was in 1996-7, just when Revit was a mere flash in the minds of Leonid and Irwin. Seems logical now but then it was practically laughable that I'd model the building to virtually install our equipment. If the building was already a model...hmmm, different story or reaction perhaps? A few years later, after I'd left to join an architecture firm, they started to use Autodesk Inventor after dabbling with Mechanical Desktop.
I just mocked up the images posted here in less than 20 minutes, 5 for the rigging component, using a dwg file I downloaded from their site as a guide for the form. Then a few minutes to layout the building form and structure and finally the rest fussing with views.
What are you doing?

